The Migration Journal6 Rs, phases, and strategy

Migration route › Case Studies

Case Studies

Waypoints filed under Case Studies.

Waypoints

Case Studies Case Studies Show Replatforming Beats Lift-and-Shift for Cloud Migration PhaseReplatforming decision and execution within the migration lifecycle DurationTypically 4–12 weeks per application, depending on complexity and testing requirements Cost factorEngineering effort to refactor, test, and validate platform changes across environments RollbackRevert to the original platform stack using preserved artifacts and DNS or routing rollback Replatforming, often called lift-and-reshape, occupies a middle ground between lift-and-shift and full refactoring. Case Studies Cloud Migration Case Studies: Busting the Myths That Cost You Money PhaseMigration planning and execution across assessment, pilot, and cutover stages DurationTypically three to twelve months depending on portfolio size, with individual workload waves running two to eight weeks each Cost factorDiscovery and dependency mapping effort, data egress and transfer volume, re-platforming or refactoring engineering hours, parallel-run infrastructure, and staff training time RollbackMaintain a tested fallback to the source environment or a last-known-good state, with frozen data snapshots, documented reverse cutover steps, and a decision threshold that triggers rollback Cloud migration case studies are often told as tidy success stories: a company decides to move, lifts its applications, and enjoys immediate agility. Case Studies We Tried Lift-and-Shift. It Flopped. Here's What Actually Worked. PhaseMigration execution and cutover DurationTypically 3 to 12 months depending on portfolio size and complexity Cost factorData egress, duplicate running costs during parallel operation, and rework from inadequate discovery RollbackRevert to the original environment using pre-migration snapshots, DNS rollback, and synchronized data copies The lift-and-shift migration promised speed and simplicity. Case Studies Stop Rehosting Everything: Why Replatforming Is the Unsung Hero of Cloud Migration PhaseMigration execution and post-migration optimization, with emphasis on the replatforming decision point that sits between assessment and cutover. DurationTypically several weeks to a few months per workload wave, depending on coupling, data volume, and how much of the application is genuinely being changed. Cost factorEngineering effort to refactor, retest, and re-certify each workload, plus the operational learning curve and dual-running overlap while old and new environments coexist. RollbackKeep the source environment intact and runnable until the replatformed workload passes acceptance, then fall back to the original stack for the affected workload only rather than reversing the whole program. Most migration programs begin with a quiet compromise. Case Studies Refactor First? Why Most Cloud Migrations Should Skip 'Lift and Shift' PhaseMigration and modernization execution Duration3 to 12 months, depending on application complexity and refactoring depth Cost factorEngineering effort for refactoring and data migration, plus parallel run costs during cutover RollbackMaintain original environment in a rollback-ready state with synchronized data and tested failback procedures The lift-and-shift approach, also known as rehosting, has long been the default for cloud migrations. Case Studies Cloud Migration Case Studies: The Wins Come From Retiring Apps, Not Lifting Them PhaseAssessment and planning through decommissioning DurationTypically 6 to 18 months depending on portfolio size Cost factorApplication rationalization and decommissioning efforts RollbackMaintain original systems until new ones are validated, then decommission Cloud migration is often framed as a lift-and-shift exercise: take what you have and move it to a cloud environment.

Other lanes